infernicalminecraft infernicalminecraft
  • 01-11-2019
  • Mathematics
contestada

To complete a job a crew of 8 people needs 18 days. How long will the same job be finished if the crew will have 9 people?

Respuesta :

rockyrules789 rockyrules789
  • 01-11-2019

Answer:

16

Step-by-step explanation:

.

Answer Link
lajfoaofje lajfoaofje
  • 27-06-2020

Answer:

16

Step-by-step explanation:

Answer Link

Otras preguntas

Who is a sessions judge​
help pls :p 1. Measure of each angle in the equilateral triangle is represented by the expression 2X +4 what is the value of X? 2. The sides of the triangle hav
I NEEEDDD HELPPPPP AND SHOW MY WORK
An antonym for the word dire is: hated unimportant dreaded changed
Answer please !?? !!!
8 - 10 is the same as A. -8 + -10 B. 8 + (-10) C. -8 + 10 D. 8 + 10
Rico, a scuba diver, uses breathing gear to help him breathe air underwater. He always gets enough sleep and eats a good breakfast before a dive. What could hap
How do HOT AIR BALLOONS work when ascending and descending explain in terms of gas behavior?
What is the equation of the line that passes through the point (-8, 5) and has a slope of -1/4
Which answer option most likely describes an essay written to inform. PLEASE ANSWER I DONT WANT A BAD GRADE. A. An essay describing ways to get a good night sle