sadiekoerper sadiekoerper
  • 01-03-2020
  • Mathematics
contestada

A construction company needs to remove 4 1 6 tons of dirt from a construction site. They can remove 8 9 tons of dirt each hour. What is the total number of hours it will take to remove the dirt

Respuesta :

adekuadenike30 adekuadenike30
  • 01-03-2020

Answer:4.674hours

Step-by-step explanation:

1hr-89tons

24hrs-xtons

X=24×89

X=2136tons

24hrs-2136tons

Yhr-416tons

Y=24×416\2136

Y=4.674hrs

Answer Link

Otras preguntas

To make curtains for a living room window for a customer, you will need three pieces of fabric in the following lengths: 3 feet, 3 feet, and 5 feet. What is th
The line with equation ax+by=20 passes through the points(-2,10) and (1,5)find a and b
__________ means to move from one region to another. When animals regularly move as a group from one region to another and back, it's a ______________.
if log28 = log4 +logx what is the value of x
Solve: K= 2(11 - k) + 14
Who was the first person to walk in the moon
How many cups are in 1 gallon of water
Why is carbon unique among the elements?????
Which substance does not obey the Lewis octet rule? a. O₂ b. NO c. CO d. N₂ Can anyone explain this one for me?
which is an example of a physical change* metal rusting*silver tarnishing* water boiling* paper burning