maaf34nb8f maaf34nb8f
  • 01-04-2021
  • Engineering
contestada

A short framing member that fills the space
between the rough sill and the soleplate is a

Respuesta :

iBear25k
iBear25k iBear25k
  • 01-04-2021

A short framing member that fills the space between the rough sill and the soleplate is a cripple stud.

(HAVE A GOOD DAY!!!)

Answer Link

Otras preguntas

How do I find the answer to m
Roberto is downloading a large file from the Internet, and for the first minute of the download, the download speed was 600 kb per second. In each subsequent m
Which of the following is the name of the body of water/ice that many early settlers crossed to come to North America?A.Persian Straits B.Western Straits C.Beri
During what processes of the water cycle does a liquid turn into a gas
Which of the following pairs of a greenhouse gas and its cause is not accurate? A. methane : burning of fossil fuels B. carbon dioxide : cars and trucks C. meth
How do you recognize the brand name of a drug in the package insert? a. the brand name appears in capital letters and is enclosed in parentheses. b. the brand
What is the area of each semicircle of the following composite figure? Help.Dose this seem like 6th grade?
Amy, jan, and beth have decided to combine their talents in a business partnership. one of the benefits they'll have over a sole ownership is a. less personal
Find the volume of the solid in the first octant bounded by the parabolic cylinder z = 4 − x2 and the plane y = 2.
Which of the following substances dissolves most readily in gasoline? A. CH4 B. HC1 C. NH3 D. NaBr