nikolaungurian nikolaungurian
  • 03-03-2022
  • Mathematics
contestada


It takes 12 men 5 days to complete a job. Work out how many days it would take 3 men to complete the same job.

Respuesta :

Esther
Esther Esther
  • 03-03-2022

Answer:

20 days

Step-by-step explanation:

It takes 12 men 5 days to complete a job. Work out how many days it would take 3 men to complete the same job.

12 * 5 = 60

60/3 = 20

It will take 3 men 20 days to do the same job

Answer Link

Otras preguntas

Carmen and Matt are conducting different chemistry experiments in school. In both experiments, each student starts with an initial amount of water in a flask. T
This question must be at least 3 sentences long: Discuss the geologic time scale. How are time units determined in the Precambrian? How does this differ with ti
Which of the following travels the slowest in the vacuum of space? Infrared light X-rays Radio waves They all travel the same speed. Visible light
convert the following75 mL to L
I could really use your help for problem #1​
What do you look at on the mineral to tell whether an igneous rock formed above or below the surface?
y=3x-11 divided by 5. x=-1​
55. Columnar joints in a basaltic lava flow are produced by which process? a. compaction of the flow during burial b. compression-related warming and expansion
You have a coupon for 10% off a lamp that cost $60 what is the discount price of the lamp?
• Trey attended a New Year's Eve event and watched a ball drop at midnight. Prior to midnight, the bottom of the ball was 150 feet above the ground. If Trey's h