In a project network, the critical path is the sequence of activities which has the:________.

Respuesta :

66hello60
66hello60 66hello60
  • 03-08-2022

Answer:

The correct answer is the longest time

Answer Link

Otras preguntas

what is 34 in percentage?
1. Which line models the data points better and why? blue, because it's longer blue, because the data points are all close to the line red, because it goes thro
What is the unit rate for 72 ounces in 6 steaks
which symbol will make the number sentence |–13| ? –13 true? = < >
*Brain teaser* *Guess the names of these countries *Think outside the box*. *E.g* 8. Iran 1.+n+ 2.+any 3.++s 4.J++ 5.+a 6. 7.J+ 8.I+ 9.U++ 10. +la 11. =+ 12.+☔
Which two groups fought a civil war in China both before and after World War II? the peasants and the middle class the warlords and the emperor the nationalists
how does equilateral triangle represent balance when considering a healthy life?
Which element includes logos, ethos, and pathos? theme statements thesis statements rhetorical devices purpose statements
All are examples of speed except ______ -5 miles per hour -6 miles per hour north -125 meters per second
the cost of 3 bottles of apple spread is $7.41. what is the cost of each bottle of apple spread? $1.62 $2.47 $4.41 $10.41